Donate using PayPal

Tags: surface

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Falkirk.
Go to the national CycleStreets photo listings for photos beyond.

Unfinished trenching work at the Kelpies Marina.

Molehills in the asphalt?

The asphalt surface has ended as the HArTT cycle path nears the River Carron.

A barrier at the Cumbernauld Road bridge and crossing on the Forth & Clyde Canal towpath, but no asphalt for the bypass gap.

End of the asphalt as the path heads towards the Westquarter Burn.

The road surface at the end of Callendar Boulevard is even worse than this photograph! There is a painted cycle lane on the left side of the carriageway, but not the right.

A poorly filled trench across the shared-use footway/cycleway alongside the A9, and a 'Cyclists Dismount' sign at the pedestrian crossing. The shared footway continues (for a short distance) beyond the crossing.

One missing bollard at the end of Bog Road and the joyriders are out taking advantage of it. When is the motoring community going to get to grips with this sort of behaviour?

A track in Callendar Woods. Nice views, but the surface is not so good for cycling.

A steep access ramp to the Union Canal towpath, although there's not much that could be done to reduce the gradient without a big budget.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://falkirk.cyclestreets.net/photomap/tags/surface/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.