Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | basin, canal, park, portdundas, redevelopment, sighthill |
Date time: | 4.49pm, Monday 27th March, 2023 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The path from Pinkston Road approaching Port Dundas Basin. The path to the right is the step-free route to the canal.
Comments reflect the views of the original submitter only.