Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | whitstable |
Date time: | 11.20am, Friday 25th March, 2022 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Canterbury |
Share With Care markings on the seafront route east from Whitstable (NCN regional route 15) - footpath to Tankerton to the right
Comments reflect the views of the original submitter only.